
The interior of the elevated tank has been cleaned and repainted, tank hatches have been upgraded, and nine steel roof support beams have been replaced. A 12-inch drain and an 8-inch overflow pipe have been completely renovated and a new catch basin has been added. New mixers are ready to be installed in the roof after the elevated tower is back in service.