Mayor's Office

Mayor’s Office

Water tower sends message of Flint community’s strength

The interior of the elevated tank has been cleaned and repainted, tank hatches have been upgraded, and nine steel roof support beams have been replaced. A 12-inch drain and an 8-inch overflow pipe have been completely renovated and a new catch basin has been added. New mixers are ready to be installed in the roof after the elevated tower is back in service.