To view a specific document, click on the appropriate Bid/Proposal attachment. To compete in the bid/proposal process you will need to print the document, completely fill in and return to the Purchasing Department prior to the date and time noted. Bid/Proposal documents received after date and time posted will not be considered.
City of Flint – Open Bids/Proposals
Bid/Proposal | Description | Attachments | Due Date |
---|---|---|---|
P21-604 | Lift Station Pumps | P21-604 – Lift Station Pumps | 3/9/21 at 3:00 PM for Hard Copy
3/9/21 at 1:00 PM for Electronic Copy |
P21-592 | Waste Collection Services for City of Flint | P21-592 – Waste Collection Services for City of Flint | BID DUE DATE 3/9/21 @ 3:00 PM |
P21-592 Addendum #3 |
Waste Collection Services for City of Flint | P21-592 – Addendum #3 – Waste Collection Services for City of Flint | Tuesday, March 9, 2021 at 3:00 PM |
P21-592 Addendum #2 |
Waste Collection Services for City of Flint | P21-592 – Addendum #2 – Waste Collection Services for City of Flint | Tuesday, March 9, 2021 at 3:00 PM |
P21-592 Addendum #1 |
Waste Collection Services for City of Flint | P21-592 – Addendum #1 – Waste Collection Services for City of Flint | Tuesday, March 9, 2021 at 3:00 PM |
P21-592 | Waste Collection Services for City of Flint | Questions to submit before Mandatory Vendor Pre-Proposal Meeting | Monday, February 15, 2021 before 10:00 AM |
P21-592 | Waste Collection Services for City of Flint | MANDATORY VENDOR PRE-PROPOSAL MEETING – SEE PROPOSAL | Wednesday, February 17, 2021 at 10:00 AM |
P21-601 | Vehicle Towing and Storage Disposal | P21-601 – Vehicle Towing and Storage Disposal | 2/23/21 @ 3:00 PM for Hard Copy
2/23/21 @ 1:00 PM for Electronic Copy |
P21-602 Addendum #1 |
Sludge Storage Pipe Fabrication Project | P21-602 – Addendum #1 – Sludge Storage Pipe Fabrication Project | 2/23/21 @ 3:00 PM for Hard Copy
2/23/21 @ 1:00 PM for Electronic Copy |
P21-602 | Sludge Storage Pipe Fabrication Project | P21-602 – Sludge Storage Pipe Fabrication Project | 2/23/21 @ 3:00 PM for Hard Copy
2/23/21 @ 1:00 PM for Electronic Copy |
P21-544 REBID | Concrete Installation & Repair | P21-544 – Rebid – Concrete Installation & Repair | 2/23/21 @ 3:00 PM for Hard Copy
2/23/21 @ 1:00 PM for Electronic Copy |
P21-600 | Uniform Shirts and Pants for City of Flint Fire Department | P21-600 – Uniform Shirts and Pants for City of Flint Fire Department | 2/11/21 @ 3:00 PM for Hard Copy
2/11/21 @ 1:00 PM for Electronic Copy |
P21-599 Addendum#03 | Demolition at the Former Pierce Park Golf Course Clubhouse | P21-599 – Addendum 03 – Demolition at the Former Pierce Park Golf Course Clubhouse | 1/25/20 @ 3:00 PM for Hard Copy
1/25/20 @ 1:00 PM for Electronic Copy |
P21-599 Addendum#02 | Demolition at the Former Pierce Park Golf Course Clubhouse | P21-599 – Addendum 02 – Demolition at the Former Pierce Park Golf Course Clubhouse | 1/25/20 @ 3:00 PM for Hard Copy
1/25/20 @ 1:00 PM for Electronic Copy |
P21-599 Addendum#01 | Demolition at the Former Pierce Park Golf Course Clubhouse | P21-599 – Addendum 01 – Demolition at the Former Pierce Park Golf Course Clubhouse | 1/25/20 @ 3:00 PM for Hard Copy
1/25/20 @ 1:00 PM for Electronic Copy |
P21-599 | Demolition at the Former Pierce Park Golf Course Clubhouse | P21-599 – Demolition at the Former Pierce Park Golf Course Clubhouse | 1/25/20 @ 3:00 PM for Hard Copy
1/25/20 @ 1:00 PM for Electronic Copy |
P21-598 | Screening for Essential Employees for City of Flint | P21-598 – Screening for Essential Employees for City of Flint | 1/20/21 @ 3:00 PM for Hard Copy
1/20/21 @ 1:00 PM for Electronic Copy |
P21000588 REBID | LARGE PUMP REPAIRS | P21-588 – LARGE PUMP REPAIR | 12/17/2020 @ 4:00 PM FOR HARD COPY
12/17/20 @ 3:00 PM FOR ELECTRONIC COPY |
P21000507 REBID | Lead Based Paint Hazard Control | P21-507-Lead Based Paint Hazard Control SERVICE | 12/17/2020 @ 4:00 PM FOR HARD COPY
12/17/20 @ 3:00 PM FOR ELECTRONIC COPY |
P21-584 (REBID) ADDENDUM #1 |
Velodyne Repair Parts | P21-584 – Addendum 1 – Velodyne Repair Parts (Rebid) | BID CANCELLED |
P21-584 (REBID) | 2 YRS. – Velodyne Repair Parts | P21-584 – Rebid – 2 YRS. – Velodyne Repair Parts | BID CANCELLED |
P21-587 (REBID) | 3 (YR) Specialty Oils | 3 (YR) Specialty Oils | 12/8/20 @ 3:00 PM for Electronic Copy 12/8/20 @ 4:00 PM for Hard Copy |
P21-587 (REBID) – Addendum 1 | 3 (YR) Specialty Oils | P21-587 – Rebid – Addendum 1 – 3 (YR) Specialty Oils | 12/8/20 @ 3:00 PM for Electronic Copy 12/8/20 @ 4:00 PM for Hard Copy |
P21-583 (REBID) | 2 YRS – Fabricated Steel Parts | P21-583 – Rebid- Fabricated Steel Parts | 12/8/20 @ 3:00 PM for Electronic Copy 12/8/20 @ 4:00 PM for Hard Copy |
P21-573 (REBID) | (2) YR SCAG Mower Parts | P21-573 – REBID – (2) YR SCAG Mower Parts | 12/8/20 @ 3:00 PM for Electronic Copy 12/8/20 @ 4:00 PM for Hard Copy |
P21-578 (REBID) | Professional Services for Consulting Assistance to Prepare a Section 108 Loan Application | Professional Services for Consulting Assistance to Prepare a Section 108 Loan Application | 12/3/20 @ 4:00 PM |
P21-572 ADDENDUM #3 |
DORT PUMP STATION | ADDENDUM #3 – DORT PUMP STATION REHABILITATION | 12/10/20 @ 3:00 PM |
P21-572 ADDENDUM 2 |
DORT PUMP STATION | ADDENDUM 2 – P21-572 DORT PUMPING STATION | 12/10/20 @ 3:00 PM |
P21-572 MANDATORY ZOOM PREBID MEETING |
DORT PUMP STATION REHABILITATION | MANDATORY – VIRTUAL ZOOM – PRE BID MEETING – SEE PROPOSAL | 11/18/20 @ 10:00 AM MANDATORY PREBID MEETING – VIRTUAL ZOOM |
P21-572 DORT PUMP STATION REHABILITATION |
DORT PUMP STATION REHABILITATION – SPECIFICATIONS – 1 & 2 | DORTPUMPSTATION-SPECIFICATIONS 1&2 | BID DUE DATE 12/10/20 @ 3:00 PM |
P21-572 DORT PUMP STATION REHABILITATION |
DORT PUMP STATION REHABILITATION – PLANS – 1 & 2 | P21-572-DORTRESERVOIRPUMPINGSTATION-DORT PLANS | BID DUE DATE 12/10/20 @ 3:00 PM |
P21-572 – Addendum 1 |
Dort Pump Station Rehabilitation | P21-572 – Addendum 1 – Dort Pump Station Rehabilitation | Bid Due Date 12/10/20 @ 3:00 PM |
P21-591 | Flint River FEMA Map Revisions | Flint River FEMA Map Revisions | 12/9/20 @ 3:00 PM |
P21-590 | Gauges | Gauges | 11/12/20 @ 3:00 PM FOR ELECTRONIC COPY 11/12/20 @ 4:00 PM FOR HARD COPY |
P21-589 | Calibration Test Equipment | Calibration Test Equipment | 11/12/20 @ 3:00 PM FOR ELECTRONIC COPY 11/12/20 @ 4:00 PM FOR HARD COPY |
P21-588 | (3) Year Large Pump Repair & Machining Services | (3) Year Large Pump Repair & Machining Services | 11/12/20 @ 3:00 PM FOR ELECTRONIC COPY 11/12/20 @ 4:00 PM FOR HARD COPY |
P21-587 | (3) Year Specialty Oils | (3) Year Specialty Oils | 11/12/20 @ 3:00 PM FOR ELECTRONIC COPY 11/12/20 @ 4:00 PM FOR HARD COPY |
P21-586 | Positive Displacement Parts – Seepex | Positive Displacement Parts – Seepex | 11/12/20 @ 3:00 PM FOR ELECTRONIC COPY 11/12/20 @ 4:00 PM FOR HARD COPY |
P21-585 | Positive Displacement Parts – Netzch | Positive Displacement Parts – Netzch | 11/12/20 @ 3:00 PM FOR ELECTRONIC COPY 11/12/20 @ 4:00 PM FOR HARD COPY |
P21-584 | Velodyne Repair Parts | Velodyne Repair Parts | 11/12/20 @ 3:00 PM FOR ELECTRONIC COPY 11/12/20 @ 4:00 PM FOR HARD COPY |
P21-583 | Fabricated Steel Parts | Fabricated Steel Parts | 11/12/20 @ 3:00 PM FOR ELECTRONIC COPY 11/12/20 @ 4:00 PM FOR HARD COPY |
P21-582 | (2) Year Clarifier Parts | (2) Year Clarifier Parts | 11/12/20 @ 3:00 PM FOR ELECTRONIC COPY 11/12/20 @ 4:00 PM FOR HARD COPY |
P21-581 | (3) Year Chopper Pump Parts | (3) Year Chopper Pump Parts | 11/12/20 @ 3:00 PM FOR ELECTRONIC COPY 11/12/20 @ 4:00 PM FOR HARD COPY |
P21-580 | (2) Year Whole Effluent Toxicity Testing | (2) Year Whole Effluent Toxicity Testing | 11/12/20 @ 3:00 PM FOR ELECTRONIC COPY 11/12/20 @ 4:00 PM FOR HARD COPY |
P21-574 | Fiberglass Repair | Fiberglass Repair | 11/12/20 @ 3:00 PM FOR ELECTRONIC COPY 11/12/20 @ 4:00 PM FOR HARD COPY |
P21-575 | WATER & SEWER RATE STUDY | P21-575 – WATER & SEWER RATE STUDY | 11/12/20 @ 4:00 PM |
P21-575 | Water & Sewer Rate Study | P21-575 – Addendum 1 – Water & Sewer Rate Study | 11/12/20 @ 4:00 PM |
P21-578 | PROFESSIONAL SERVICES FOR CONSULTING ASSISTANCE TO PREPARE A SECTION 108 LOAN APPLICATION | P21-578 Professional Services for Consulting Assistance to Prepare a Section 108 Loan Application | 11/12/20 @ 4:00 PM |
P21-573 | 2 Year SCAG Mower Parts | 2 Year SCAG Mower Parts | 11/2/20 @ 4:30 PM (HARDCOPY) ………………………………… 11/2/20 @ 3 PM (ELECTRONIC COPY) |
P21-507 | COF – LEAD BASED PAINT HAZARD CONTROL WORK | P21-507-COF LBPHC – PROGRAM SERVICES PROVIDER | 10-26-20 @ 4:30 PM (HARDCOPY) ……………………………… 10/26/20 @ 3 PM (ELECTRONIC COPY) |
P21-535 | SNOW REMOVAL SERVICES FOR CITY HALL CAMPUS & OTHER FACILITIES | P21-535 – SNOW REMOVAL SERVICES FOR CITY HALL CAMPUS & OTHER FACILITIES | 10-26-20 @ 4:30 PM (HARDCOPY) ……………………………… 10/26/20 @ 3 PM (ELECTRONIC COPY) |
P21-511 | (2) YR STAINLESS STEEL PIPE REPAIR CLAMPS | P21-511- (2) YR STAINLESS STEEL PIPE REPAIR CLAMPS | 10-21-2020 @ 4:30 PM FOR ELECTRONIC COPY 10-21-2020 @ 3:00 PM FOR HARD COPY |
P21-566 | BATTERY B GRIT REMOVAL IMPROVEMENTS – ENGINEERING SERVICES | P21-566 – BATTERY B GRIT REMOVAL IMPROVEMENTS – ENGINEERING SERVICES | 11/2/20 @ 2:00 PM |
P21-566 Addendum |
Battery B Grit Removal Improvements – Engineering Services | P21-566 – Addendum 1 – Battery B Grit Removal Improvements – Engineering Services | 11/2/20 @ 2:00 PM |
P21-556 | PRIMARY CLARIFIER IMPROVEMENTS – ENGINEERING SERVICES | P21-556 – PRIMARY CLARIFIER IMPROVEMENTS – ENGINEERING SERVICES | 11/2/20 @ 2:00 PM |
P21-556 Addendum 1 |
Primary Clarifier Improvements – Engineering Services | P21-556 – Addendum 1 – PRIMARY CLARIFIER IMPROVEMENTS – ENGINEERING SERVICES | 11/2/20 @ 2:00 PM |
P21-560 | SECONDARY CLARIFIER IMPROVEMENTS – ENGINEERING SERVICES | P21-560 – https://www.cityofflint.com/wp-content/uploads/P21-560-RFQ-SECONDARY-CLARIFIER-IMPROVEMENTS.pdf | 11/2/20 @ 2:00 PM |
P21-560 Addendum 1 |
Secondary Clarifier Improvements – Engineering Services | P21-560 – Addendum 1 – Secondary Clarifier Improvements – Engineering Services | 11/2/20 @ 2:00 PM |
P21-549 | Third Ave. Pumping Station Improvements – Engineering Services | P21-549 – THIRD AVE PUMPING STATION IMPROVEMENTS-– ENGINEERING SERVICES | 11/2/20 @ 2:00 PM |
P21-549 Addendum 1 |
Third Ave. Pumping Station Improvements – Engineering Services | P21-549 – Addendum 1 – Third Ave. Pumping Station Improvements – Engineering Services | 11/2/20 @ 2:00 PM |
P21-546 ADDENDUM 2 |
Robert T. Longway Rehabilitation – CE Project | P21-546 ADDENDUM 2 – Robert T. Longway Rehabilitation – CE Project | 10/14/20 @ 4:30 PM |
P21000571 | COF LBPHC – LICENSED LEAD-BASED PAINT LEAD INSPECTOR/RISK ASSESSORS | P21-571-MICHIGAN LICENSED LEAD-BASED PAINT LEAD INSPECTORS/RISK ASESSORS | ELECTRONIC COPY DUE 10/12/2020 @ 3pm AND ORIGINAL HARDCOPY DUE 10/12/2020 BY 4:30 PM |
P21-546 ADDENDUM 1 |
ROBERT T. LONGWAY REHABILITATION – CE PROJECT | P21-546 ADDENDUM 1 – ROBERT T LONGWAY REHAB | 10-14-20 @ 4:30 PM |
P21-546 | ROBERT T. LONGWAY REHABILITATION – CE PROJECT | P21-546 – ROBERT T LONGWAY REHABILITATION PROJECT – CE | 10-14-20 @ 4:30 PM – Due Date ……………………………… WILL NOT ACCEPT ELECTRONIC COPY FOR THIS PROPOSAL 10-14-20 @ 4:30 PM FOR MAILED OR HARD COPY (MUST BE SEALED) |
BID #21-034 (21000034) |
GENERATOR INSPECTION & REPAIRS | B21-034 – GENERATOR INSPECTION & REPAIRS | 9-09-20 @ 3:00 PM FOR ELECTRONIC COPY 09-09-20 @ 4:30 PM FOR HARD COPY |
P21-519 – CONSTRUCTION EQUIPMENT RENTAL | CONSTRUCTION EQUIPMENT RENTAL | P21-519 – CONSTRUCTION EQUIPMENT RENTAL | 9-09-20 @ 3:00 PM FOR ELECTRONIC COPY 09-09-20 @ 4:30 PM FOR HARD COPY |
P21-520 ( REVISED) 8-26-20 |
DUCTILE IRON PARTS | P21-520 – DUCTILE IRON PARTS | 9-09-20 @ 3:00 PM FOR ELECTRONIC COPY 09-09-20 @ 4:30 PM FOR HARD COPY |
P21-521 | FILTER BELT PRESS PARTS | P21-521 – FILTER BELT PRESS PARTS | 9-09-20 @ 3:00 PM FOR ELECTRONIC COPY 09-09-20 @ 4:30 PM FOR HARD COPY |
P21-525 | MISC. HARDWARE & HAND TOOLS | P21-525 – HARDWARE & HAND TOOLS | 8-28-20 @ 3:00 PM FOR ELECTRONIC COPY 8-28-20 @ 4:30 PM FOR HARD COPY |
P21-526 | VARIOUS NON-METALLIC PIPE, FITTINGS, AND CONNECTORS AND WATER/SEWER PIPE REPAIR PARTS | P21-526-VARIOUS NON-METALLIC PIPE, FITTINGS, AND CONNECTORS AND WATER/SEWER PIPE REPAIR PARTS | 9-09-20 @ 3:00 PM FOR ELECTRONIC COPY 09-09-20 @ 4:30 PM FOR HARD COPY |
P21-554 | OVERHEAD CRANE | P21-554 – OVERHEAD CRANE | 9-09-20 @ 3:00 PM FOR ELECTRONIC COPY 09-09-20 @ 4:30 PM FOR HARD COPY |
P21-555 | MISC HIGH PRESSURE PNEUMATIC HOSES & FITTINGS | P21-555 – MISC HP PNEUMATIC HOSES & FITTINGS | 8-28-20 @ 3:00 PM FOR ELECTRONIC COPY 8-28-20 @ 4:30 PM FOR HARD COPY |
P21-518 | WATER SERVICE/WATER MAIN REPAIR PARTS | P21-518 – WATER SERVICE/WATER MAIN REPAIR PARTS | 8-28-20 @ 3:00 PM FOR ELECTRONIC COPY 8-28-20 @ 4:30 PM FOR HARD COPY |
P21-538 (REBID) | ELEVATOR MAINTENANCE | P21-538 – ELEVATOR MAINTENANCE | 8-28-20 @ 3:00 PM FOR ELECTRONIC COPY 8-28-20 @ 4:30 PM FOR HARD COPY |
P21-558 | VEGA METERS | P21-558 – VEGA METERS | 9-09-20 @ 3:00 PM FOR ELECTRONIC COPY 09-09-20 @ 4:30 PM FOR HARD COPY |
P21-570 | ALLEN BRADLEY (OEM) | P21-570 – ALLEN BRADLEY | 9-09-20 @ 3:00 PM FOR ELECTRONIC COPY 09-09-20 @ 4:30 PM FOR HARD COPY |
P20-575 (RE-BID) | SIDE WALK & STREETSCAPING IMPROVEMENTS | P20-575 – SIDEWALK & STREETSCAPING IMPROVEMENTS | 8-28-20 @ 3:00 PM FOR ELECTRONIC COPY 8-28-20 @ 4:30 PM FOR HARD COPY |
B21-010 – REBID | UNIFORM/LAB COAT/FLOOR MAT RENTAL SERVICES | B21-010 – UNIFORM/LAB COAT/FLOORMAT & RENTAL SERVICES | 7-24-20 BY 5:00 PM (ORIGINAL HARDCOPY) |
B21-010 | UNIFORM/LAB COAT/MAT | B21-010 – UNIFORM/LAB COAT/MAT | 06/17/20 @ 1:00 PM |
B21-028 | INTERSECTION UPGRADES | B21-028 – INTERSECTION UPGRADES | 04/23/20 @ 1:00 |
B21-028 ADDENDUM 1 |
INTERSECTION UPGRADE | ADDENDUM 1 – INTERSECTION UPGRADES | 04/23/20 @ 1:00 PM |
B20-029 ADDENDUM 1 |
PAINTING TWO (2) DECANT TANKS | B20-029 – ADDENDUM 1 – PAINTING TWO DECANT TANKS | 05/06/20 @ 1:00 PM |
B20-029 | PAINTING TWO DECANT TANKS | B20-029 PAINTING TWO DECANT TANKS | 05/06/20 @ 1:00 PM |
P21-500 | SUPPLY LIQUID CHLORINE/SODIUM HYPOCHLORITE-12.5% | P21-500-LIQUID CHLORINE/SODIUM HYPOCHLORITE-12.5% | 05/06/20 @ 1:00 PM |
P21-501 | SUPPLY PHOSPHORIC ACID 75% NSF GRADE | P21-501-PHOSPHORIC ACID 75% NSF GRADE | 05/06/20 @ 1:00 PM |
P21-502 – ADDENDUM I – NO BID BOND REQUIRED |
LIQUID SULFUR DIOXIDE | 05/06/20 @ 1:00 PM | |
P21-502 | LIQUID SULFUR DIOXIDE | P21-502 LIQUID SULFUR DIOXIDE | 05/06/20 @ 1:00 PM |
P21-503 | SUPPLY 16% AQUEOUS SODIUM HYPOCHLORITE | P21-503 – SUPPLY 16% AQUEOUS SODIUM HYPOCHLORITE | 05/06/20 @ 1:00 PM |
P21-504 | SUPPLY AQUEOUS FERROUS CHLORIDE | P21-504-SUPPLY AQUEOUS FERROUS CHLORIDE | 05/06/20 @ 1:00 PM |
P21-505 | LIQUID CATIONIC POLYMER FOR GRAVITY BELT THICKENER @ WPC | P21-505-SUPPLY LIQUID CATIONIC POLYMER FOR GRAVITY BELT THICKENER @WPC | 05/06/20 @ 1:00 PM |
P21-509 | SUPPLY LIQUID CHLORINE @WPC | P21-509-SUPPLY LIQUID CHLORINE @ WPC | 05/06/20 @ 1:00 PM |
P21-506 ADDENDUM 1 |
MSA SOLARIS MONITOR | P21-506 – ADDENDUM 1 | 06/25/20 @ 1:00 PM |
P21-506 | MSA SOLARIS MONITOR | P21-506-MSA GAS | 06/25/20 @ 1:00 PM |
P21-514 | ASPHALT PAVING | P21-514 – ASPHALT PAVING | 06/17/20 @ 1:00 PM |
P21-533 ADDENDUM 1 |
(3) YR COMPEHENSIVE REGULATORY COMPLIANCE ASSISTANCE | P21-533 – ADDENDUM 1 | 6/25/20 @ 1:00 pm |
P21-533 | (3) YRCOMPREHENSIVE REGULATORY COMPLIANCE ASSISTANCE |
P21-533 – COMPREHENSIVE REGULATORY COMPLIANCE | 06/25/20 @ 1:00 PM |
P21-534 – REBID | Safety Supplies Personal Protective Equipment) |
P21-534 – Safety Supplies (Personal Protective Equipment) | 7-24-2020 @ 5 pm Mailed Hard copy |
P21-534 ADDENDUM 1 |
SAFETY SUPPLIES | P21-534 – ADDENDUM 1 | 6/25/20 @ 1:00 PM |
P21-534 | SAFETY SUPPLIES | P21-534 | 06/25/20 @ 1:00 PM |
P21-536 | NON-STOCK MECHANICAL PARTS | P21-536 – NON-STOCK MECHANICAL PARTS | 06/17/20 @ 1:00 PM |
P21-537 | WELDING/PIPEFITTING | P21-537 – WELDING/PIPEFITTING | 06/17/20 @ 1:00 PM |
P21-538 (RE-BID) | ELEVATOR MAINTENANCE | P21-538 – ELEVATOR MAINTENANCE RE-BID | 07/17/20 @ 4:30 PM for Original Hardcopy ELECTRONIC COPY |
P21-538 – ADDENDUM 1 | ELEVATOR MAINTENANCE | P21-538 – ADDENDUM 1 – ELEVATOR MAINTENANCE | 07/17/20 @ 4:30 PM for Original Hardcopy ELECTRONIC COPY |
P21-538 | ELEVATOR MAINTENANCE | P21-538 – ELEVATOR MAINTENANCE | 06/17/20 @ 1:00 PM |
P21-539 | NUTS,BOLTS,TOOLS& EQUIPMENT |
P21-539 | 06/17/20 @ 1:00 PM |
P21-540 | HVAC SYSTEM REPAIRS& PM | HVAC SYSTEM REPAIR & PM | 06/17/20 @ 1:00 PM |
P21-541 | ALLEN BRADLEY MODULES PARTS | ALLEN BRADLEY MODULE PARTS | 06/17/20 @ 1:00 PM |
P21-544 | CONCRETE INSTALLATION & REPAIR | P21-544 – CONCRETE INSTALLATION & REPAIR | 9-09-20 @ 3:00 PM FOR ELECTRONIC COPY 09-09-20 @ 4:30 PM FOR HARD COPY |
P21-547 (REBID) | PIPING SUPPLIES | P21-547 – PIPING SUPPLIES REBID | 8/11/20 – ELECTRONIC COPY 3:00 PM EST
MAILED COPY – 8/11/20 – 4:30 PM EST |
21-547 | PIPING SUPPLIES | PIPING SUPPLIES | 06/17/20 @ 1:00 PM |
P21-550 | MOTOR PM | MOTOR PM | 06/17/20 @ 1:00 PM |
P21-551 | ELECTRICAL PARTS | ELECTRICAL PARTS (REBID) | 08/11/20 @ 3:00 PM (ELECTRONIC COPY) & 8/11/20 @ 4:30 PM (MAILED COPY) |
P21-557 | ASBESTOS ABATEMENT | Asbestos Abatement | 08/11/20 @ 3:00 PM (ELECTRONIC COPY) & 8/11/20 @ 4:30 PM (MAILED COPY) |
P21-559 (REVISED 8-28-20) |
HYDRO INSTRUMENTS & WALLACE AND TIERNAN REPAIR PARTS | P21-559 – HYDRO INSTRUMENT & WALLACE AND TIERNAN REPAIR PARTS | 9-09-20 @ 3:00 PM FOR ELECTRONIC COPY 09-09-20 @ 4:30 PM FOR HARD COPY |
P21-513 | SUPPLY SODIUM HYDROXIDE 25% NSF GRADE @ WATER PLANT | P21-513-SODIUM HYDROXIDE 25% NSF GRADE @ WP | 05/06/20 @ 1:00 PM |
P20-569 RFP |
PROFESSIONAL SERVICES FOR PLANNING & ZONING DIVISION | ADDENDUM 1 – P20-569-PROFESSIONAL SERVICES FOR COMPREHENSIVE ZONING SERVICES | 03/16/2020 @ 1:00 PM |
P20-571 ADDENDUM #2 |
NORTHWEST PUMP STATION IMPROVEMENTS | ADDENDUM #2 – P20-571 | 06/18/2020 @ 1:00 PM |
P20-571 ADDENDUM 3 |
NORTHWEST PUMP STATION IMPROVEMENTS | P20-571 – ADDENDUM 3 | 06/18/2020 @ 1:00 PM |
Mandatory Pre-bid Meeting – June 2, 2020 @ 9:00 am BID DUE DATE: JUNE 18, 2020 @ 1:00 PM |
NORTHWEST PUMP STATION IMPROVEMENTS | P20-571-NORTHWEST PUMP STATION IMPROVEMENTS | Mandatory Pre-bid Meeting – June 2, 2020 @ 9:00 am BID DUE DATE: JUNE 18, 2020 @ 1:00 PM |
P20-571 ADDENDUM 1 |
NORTHWEST PUMP STATION IMPROVEMENTS | P20-571 – ADDENDUM – NORTHWEST PUMP STATION REHABILITATION-IMPROVEMENTS | Mandatory Pre-bid Meeting – June 2, 2020 @ 9:00 am BID DUE DATE: JUNE 18, 2020 @ 1:00 PM |
P20-571 SPECIFICATIONS |
NORTHWEST PUMP STATION IMPROVEMENTS | P20-571 – SPECIFICATIONS | 06/18/20 @ 1:00 PM |
P20-571 DRAWINGS |
NORTHWEST PUMP STATION IMPROVEMENTS | P20-571 – NORTHWEST PUMP STATION REHAB | 06/18/20 @ 1:00 PM |
P20-572 – ADDENDUM #2 | NORTHWEST PUMP STATION FLOW DIVERSION | ADDENDUM #2 – P20-572 – FLOW DIVERSION NW PUMP STATION | 6/18/20 @ 1 :00 PM |
P20-572 – MANDATORY PRE-BID MEETING | NORTHWEST PUMP STATION FLOW DIVERSION | P20-572 – NORTHWEST PUMP STATION FLOW DIVERSION | Mandatory Pre-bid Meeting – June 2, 2020 @ 9:00 am BID DUE DATE: JUNE 18, 2020 @ 1:00 PM |
P20-572 ADDENDUM 1 |
NORTHWEST PUMP STATION FLOW DIVERSION | P20-572- ADDENDUM- DIVERSION SEWER | 06/18/20 @ 1:00 PM |
P20-574 | ALTA/NSPS LAND TITLE SURVEY FOR PARCELS ASSOCIATED WITH THE FUTURE GRAND TRAVERSE GREENWAY TRAIL | P20-574-ALTA/NSPS LAND TITLE SURVEY FOR PARCELS ASSOCIATED WITH THE FUTURE GRAND TRAVERSE GREENWAY TRAIL | 05/06/20 @ 1:00 PM |
P20-574 – ADDENDUM 1-A | ALTA/NSPS LAND TITLE SURVEY FOR PARCELS ASSOCIATED WITH THE FUTURE GRAND TRAVERSE GREENWAY TRAIL | P20-574 – ADDENDUM 1 – A | 05/06/20 @ 1:00 PM |
P20-574 – ADDENDUM 1-B | ALTA/NSPS LAND TITLE SURVEY FOR PARCELS ASSOCIATED WITH THE FUTURE GRAND TRAVERSE GREENWAY TRAIL | P20-574 – ADDENDUM 1 – B | 05/06/20 @ 1:00 PM |
P20-574 – ADDENDUM 1-C | ALTA/NSPS LAND TITLE SURVEY FOR PARCELS ASSOCIATED WITH THE FUTURE GRAND TRAVERSE GREENWAY TRAIL | P20-574 – ADDENDUM 1 – C | 05/06/20 @ 1:00 PM |
P20-574 – ADDENDUM 1 – D |
ALTA/NSPS LAND TITLE SURVEY FOR PARCELS ASSOCIATED WITH THE FUTURE GRAND TRAVERSE GREENWAY TRAIL | P20-574 – ADDENDUM 1 – D | 05/06/20 @ 1:00 PM |
P20-574 – ADDENDUM 1 – E | ALTA/NSPS LAND TITLE SURVEY FOR PARCELS ASSOCIATED WITH THE FUTURE GRAND TRAVERSE GREENWAY TRAIL | P20-574-ADDENDUM 1 – D | 05/06/20 @ 1:00 PM |
P20-575 ADDENDUM 1 |
SIDEWALK & STREETSCAPING | P20-575 – SIDEWALK & STREETSCAPING | 05/15/20 @ 1:00 PM |
P20-575 | SIDEWALK & STREETSCAPE IMPROVEMENTS | P20-575-SIDEWALK & STREETSCAPE IMPROVEMENTS | 05/15/20 @ 1:00 PM |
P20-575 – ADDENDUM 2 | SIDEWALK & STREETSCAPE IMPROVEMENTS | P20-575-SIDEWALK & STREETSCAPING IMPROVEMENTS | 05/15/20 @ 1:00 PM |
P20-576- | TRAFFIC PAVEMENT LINE MARKING SERVICES | P20-576-TRAFFIC PAVEMENT LINE MARKING SERVICES | 05/06/20 @ 1:00 PM |
P20-577 | REPLACEMENT EXHAUST FANS @ WPC FILTER BUILDING | P20-577 REPLACEMENT EXHAUST FANS @ WPC FILTER BUILDING | 05/06/20 @ 1:00 PM |
P20-580 | MCKINLEY PARK IMPROVEMENTS | P20-580 – MCKINLEY PARK IMPROVEMENTS | 05/15/20 @ 1:00 PM |
P20-580 – ADDENDUM 1 | MCKINLEY PARK IMPROVEMENTS | https://www.cityofflint.com/wp-content/uploads/P20-580-MCKINLEY-PARK-IMPROVEMENTS-addendum-1.pdf | 05/15/20 @ 1:00 PM |
P20-580 – ADDENDUM 2 | MCKINLEY PARK IMPROVEMENTS | P20-580-ADDENDUM 2-MCKINLEY PARK IMPROVEMENTS | 05/15/20 @ 1:00 pm |
P20-581 VIRTUAL – HOSTED THROUGH MICROSOFT MANDATORY PRE BID INFORMATION +1 313-379-5631 CONFERENCE ID 205 207 631# |
ULTRAVIOLET DISINFECTION PROJECT @ WPC-FACILITY | JUNE 23, 2020 @ 1:00 PM | |
P20-581 MANDATORY PRE BID DATE – JUNE 12, 2020 @ 9 AM |
ULTRAVIOLET DISINFECTION PROJECT @ WPC-FACILITY | P20-581 ULTRA VIOLET DISNFECTION 632PGS | JUNE 23, 2020 @ 1:00 PM |
P20-581 – ADDENDUM 1 |
ULTRAVIOLET DISINFECTION PROJECT @ WPC-FACILITY | P20-581 – ADDENDUM 1 | JUNE 23, 2020 @ 1:00 PM |
P20-581 ADDENDUM 2 |
ULTRAVIOLET DISINFECTION PROJECT @ WPC-FACILITY | P20-581 – ADDENDUM 2 | 6/23/2020 @ 1:00 PM |
MANDATORY PRE BID DATE – JUNE 12, 2020 @ 9 AM | ULTRAVIOLET DISINFECTION PROJECT @ WPC-FACILITY | P20-581-ULTRA VIOLET PROJ 40 PGS | JUNE 23, 2020 @ 1:00 PM |
P20-582 ADDENDUM 1 |
SLUDGE DE-WATERING | P20-582 – ADDENDUM 1 | 07/01/20 @ 1:00 PM |
P20-582 ADDENDUM 2 |
SLUDGE DE-WATERING | P20-582 – ADDENDUM 2 – SLUDGE DE-WATERING | 07/01/20 @ 1:00 pm |
P20-582 ADDENDUM 3 |
SLUDGE DE-WATERING | P20-582 – ADDENDUM 3 – SLUDGE DEWATERING | 7/01/20 @ 1:00 PM |
P20-582 MANDATORY PRE-BID JUNE 11, 2020 @ 9:00 AM |
SLUDGE DEWATERING MANUAL |
P20-582 – SLUDGE DEWATERING – MANUAL | JULY 1, 2020 @ 1:00 PM |
P20-582 MANDATORY PRE-BID JUNE 11, 2020 @ 9:00 AM |
SLUDGE DEWATERING MANUAL |
P20-582 – WPC SLUDGE DEWATERING IMPROVEMENTS | JULY 1, 2020 @ 1:00 PM |
P20-582 MANDATORY PRE-BID JUNE 11, 2020 @ 9:00 AM |
SLUDGE DEWATERING PLANS/DRAWINGS |
P20-582 SLUDGE DEWAERING – PLANS/DRAWINGS | JULY 1, 2020 @ 1:00 PM |
P20-583 ADDENDUM 1 |
AERATION SYSTEM IMPROVEMENTS | ADDENDUM 1 – AERATION SYSTEM IMPROVEMENTS | 6/29/20 @ 1:00 PM |
P20-583 ADDENDUM 2 |
AERATION SYSTEM IMPROVEMENTS | P20-583 – ADDENDUM 2 | 6/29/20 @ 1:00 PM |
P20-583 ADDENDUM 3 |
AERATION SYSTEM IMPROVEMENTS | P20-583 – ADDENDUM 3 – AERATION | 6/29/20 @ 1:00 PM |
P20-583 ADVETISEMENT |
AERATION SYSTEM IMPROVEMENTS | P20-583 – ADVERTISEMENT | 6/29/20 @ 1:00 PM |
P20-583- MANDATORY PRE BID MEETING 6/9/20 9:00 AM |
AERATION SYSTEM IMPROVEMENTS | P20-583 – INSTRUCTIONS | 6/29/20 @ 1:00 PM |
P20-583- MANDATORY PRE BID MEETING 6/9/20 9:00 AM |
AERATION SYSTEM IMPROVEMENTS | P20-583 – ADVERTISEMENT | 6/29/20 @ 1:00 PM |
P20-583- MANDATORY PRE BID MEETING 6/9/20 9:00 AM |
AERATION SYSTEM IMPROVEMENTS | P20-583 – SPECIFICATIONS | 6/29/20 @ 1:00 PM |
P20-583- MANDATORY PRE BID MEETING 6/9/20 9:00 AM |
AERATION SYSTEM IMPROVEMENTS PLANS/DRAWINGS VOLUME I |
P20-583 – PLANS-DRAWINGS VOLUME I | 6/29/20 @ 1:00 PM |
P20-583- MANDATORY PRE BID MEETING 6/9/20 9:00 AM |
AERATION SYSTEM IMPROVEMENTS PLANS/DRAWINGS VOLUME II |
P20-583 – PLANS-DRAWINGS – VOLUME II | 6/29/20 @ 1:00 PM |
P20-562 MANDATORY PRE-BID MEETING – 2/20/2020 @ 10:00 AM |
SECONDARY WATER SUPPLY – PART 1 | PART 1 – SECONDARY WATER SUPPLY | 03/12/2020 @ 1:00 PM |
P20-562 | SECONDARY WATER SUPPLY – PART2 | PART 2 – SECONDARY WATER SUPPLY | 03/12/2020 @ 1:00 PM |
P20-562 | SECONDARY WATER SUPPLY – DRAWINGS PART 1 |
Part 1 DRAWINGS – SECONDARY WATER SUPPLY | 03/12/2020 @ 1:00 PM |
P20-562 | SECONDARY WATER SUPPLY – DRAWINGS PART 2 |
PART 2 – SECONDARY WATER SUPPLY | 03/12/2020 @ 1:00 PM |
P20-562 ADDENDUM 1 |
SECONDARY WATER SUPPLY-ADDENDUM 1 | P20-562 – ADDENDUM 1 – SECONDARY WATER SUPPLY | 03/12/2020 @1:00 PM |
P20-562 ADDENDUM 2 |
SECONDARY WATER SUPPLY-ADDENDUM 2 | ADDENDUM 2 – P20-562-SECONDARY WATER SUPPLY | 03/12/2020 @ 1:00 PM |
P20-562 ADDENDUM 3 |
SECONDARY WATER SUPPLY ADDENDUM 3 |
P20-562-SECONDARY WATER SUPPLY -ADDENDUM 3 | 03/12/2020 @1:00 PM |
B19-019 – ADDENDUM 1 | SPRING TREE PLANTING | SPRING TREE PLANTING | 05/15/20 @ 1:00 PM |
B-19-019 GRANT FUNDED PROJECT |
SPRING TREE PLANTING | B19-019 – TREE PLANTING | 05/06/20 @ 1:00 PM |
P20-578 – VIRTUAL – HOSTED THROUGH MICROSOFT MANDATORY PRE BID INFORMATION +1 313-379-5631 CONFERENCE ID 158 058 226# |
INFLUENT STRUCTURE & BATTERY A GRIT | MANDATORY PRE BID DATE IS JUNE 4, 2020 @ 9 AM
BID DUE DATE IS JUNE 18, 2020 @ 1:00 PM |
|
P20-578 ADDEBDUM 1 |
ADDENDUM 1 WPC INFLUENT STRUCTURE & BATTERY A GRIT REHAB |
P20-578-ASSENDUM 1 – WPC INFLUENT STRUCTURE & BATTERY A GRIT REHAB | MANDATORY PRE BID DATE IS JUNE 4, 2020 @ 9 AM
BID DUE DATE IS JUNE 18, 2020 @ 1:00 PM |
P20-578 | ADDENDUM 2 | ADDENDUM 02 | MANDATORY PRE BID DATE IS JUNE 4, 2020 @ 9 AM
BID DUE DATE IS JUNE 18, 2020 @ 1:00 PM |
P20-578 | ADDENDUM 3 | ADDENDUM 3 | MANDATORY PRE BID DATE IS JUNE 4, 2020 @ 9 AM
BID DUE DATE IS JUNE 18, 2020 @ 1:00 PM |
P20-578 | ADADDENDUM 4 WPC INFLUENT STRUCTURE & BATTERY A GRIT REHABDENDUM 4 |
P20-578 – ADDENDUM 04 | MANDATORY PRE BID DATE IS JUNE 4, 2020 @ 9 AM
BID DUE DATE IS JUNE 18, 2020 @ 1:00 PM |
P20-578 | ADADDENDUM 5 WPC INFLUENT STRUCTURE & BATTERY A GRIT REHAB |
P20-578 – ADDENDUM #5 – | 6/18/20 @ 1:00 PM |
P20-578 – | #1 – WPC INFLUENT STRUCTURE & BATTERY A GRIT REHAB | P20-578 -#1 – WPC INFLUENT STRUCTURE & BATTERY A GRIT REHAB | MANDATORY PRE BID DATE IS JUNE 4, 2020 @ 9 AM
BID DUE DATE IS JUNE 18, 2020 @ 1:00 PM |
P20-578 | #2 – WPC INFLUENT STRUCTURE & BATTERY A GRIT REHAB | P20-578-#2 – WPC INFLUENT STRUCTURE & BATTERY A GRIT REHAB | MANDATORY PRE BID DATE IS JUNE 4, 2020 @ 9 AM
BID DUE DATE IS JUNE 18, 2020 @ 1:00 PM |
P20-578 DRAWINGS 1 |
DRAWINGS 1 – WPC INFLUENT STRUCTURE & BATTERY A GRIT REHAB | P20-578-DRAWINGS 1- | MANDATORY PRE BID DATE IS JUNE 4, 2020 @ 9 AM
BID DUE DATE IS JUNE 18, 2020 @ 1:00 PM |
P20-578 DRAWINGS 2 |
DRAWINGS 2 – WPC INFLUENT STRUCTURE & BATTERY A GRIT REHAB | P20-578-DRAWINGS 2 | MANDATORY PRE BID DATE IS JUNE 4, 2020 @ 9 AM
BID DUE DATE IS JUNE 18, 2020 @ 1:00 PM |
P20-579 – ADDENDUM 1 | 2020 ReCAST MINI GRANT APPLICATION | P20-579-ADDENDUM 1 – ReCAST MINI-GRANT APPLICATION | 05/15/20 @ 1:00 PM |
P20-579 – ADDENDUM 2 | 2020 ReCAST MINI GRANT APPLICATION | P20-579 – ADDENDUM2 – ReCAST | 05/15/20 @ 1:00 PM |
P20-579 | 2020 ReCAST MINI GRANT APPLICATION | P20-579-2020 ReCAST MINI GRANT APPLICATION | 05/15/20 @ 1:00 PM |
P20-566 (REBID) | WATER POLLUTION CONTROL THIRD AVENUE PUMPING STATION – DRIVE SHAFT FABRICATION |
REBID – P20000566 – 3RD AVE PUMPING STATION DRIVE SHAFT FABRICATION | 03/11/2020 @ 1:00 PM |
P20-569 RFP | PROFESSIONAL SERVICES FOR PLANNING & ZONING DIVISION | P20000569-PROFESSIONAL SERVICES FOR PLANNING & ZONING | 03/09/20 @ 1:00 PM |
P20-566 | WATER POLLUTION CONTROL THIRD AVENUE PUMPING STATION – DRIVE SHAFT FABRICATION |
P20000566 – WATER POLLUTION CONTROL THIRD AVENUE PUMPING STATION – DRIVE SHAFT FABRICATION | 03/03/2020 @ 1:00 PM |
P20-558 | PRELIMINARY DESIGN SERVICES FOR MILLER ROAD FROM HAMMERBERG ROAD TO BALLENGER HIGHWAY PROJECT AND OPTIONAL WATER MAIN REPLACEMENT | PRELIMINARY DESIGN SERVICES FOR MILLER ROAD FROM HAMMERBERG ROAD TO BALLENGER HIGHWAY PROJECT AND OPTIONAL WATER MAIN REPLACEMENT | 02/26/2020 @ 1:00 PM |
P20-564 | RENOVATION TO MCKINLEY COMMUNITY CENTER | P20-564 – RENOVATION TO MCKINLEY COMMUNITY CENTER | 02/26/2020 @ 1:00 PM |
P20-564 ADDENDUM 1 |
RENOVATION TO MCKINLEY COMMUNITY CENTER | ADDENDUM 1 – RENOVATIONS FOR MCKINLEY COMMUNITY CENTER | 02/26/2020 @ 1:00 PM |
P20-564 ADDENDUM 2 |
RENOVATION TO MCKINLEY COMMUNITY CENTER | ADDENDUM 2 – RENOVATIONS FOR MCKINLEY CENTER | 02/26/2020 @ 1:00 PM |
P20-553 REBID | MCKINLEY & FARNUUMWOOD PARKS INSTALLATION SERVICES | P20-553-MCKINLEY&FARNUMWOOD PARKS INSTALLATION SERVICES | 02/19/2020 @ 1:00 PM |
P20-559 | NEW DURESS SMART SYSTEM | P20-559 – NEW DURESS SMART SYSTEM | 02/19/2020 @ 1:00 PM |
P20-561
MANDATORY PRE BID DATE 02/05/20 |
DORT RESERVOIR REHABILITATION – INVITATION TO BID | DORT RESERVOIR REHABILITATION – INVITATION TO BID | 02/19/2020 @ 1:00 PM |
P20-561
MANDATORY PRE BID DATE 02/05/20 |
DORT RESERVOIR REHABILITATION – CONTRACT BOOK | DORT RESERVOIR REHABILITATION – CONTRACT BOOK | 02/19/2020 @ 1:00 PM |
P20-561
MANDATORY PRE BID DATE 02/05/20 |
DORT RESERVOIR REHABILITATION – DESIGN DRAWINGS |
DORT RESERVOIR REHABILITATION – DRAWINGS | 02/19/2020 @ 1:00 PM |
P20-561 ADDENDUM 1 |
DORT RESERVOIR REHABILITATION – | ADDENDUM 1 – DORT RESERVOIR REHABILITATION | 02/19/2020 @ 1:00 PM |
P20-553 ADDENDUM 1 |
MCKINLEY & FARNUUMWOOD PARKS INSTALLATION SERVICES | ADDENDUM 1 – P20-553 MCKINLEY & FARNUMWOOD PARKS INSTALLATION SERVICES | 02/19/20 @ 1:00 PM |
P20-548 – ADDENDUM #2 – SEE ATTACHMENT |
ADDENDUM #2 OAK BUSINESS CENTER – FIRE SUPPRESSION SYSTEM UPGRADES TO MEET NFPA 13 |
ADDENDUM #2 – 20000548 – “Oak Business Center – Fire Suppression System Upgrades to Meet NFPA 13” | BID DUP20-572 – ADDENDUM – DIVERSION SEWERE DATE: CHANGED TO FEBRUARY 5, 2020 @ 1:00 PM |
P20-553 | MCKINLEY & farnumwood PLAYGROUND INSTALLATION SERVICES | MCKINLEY PLAYGROUND INSTALLATION | 01/22/2020 @ 1:00 PM |
ADDENDUM #1 P20-553 |
MCKINLEY & FARNUMWOOD PLAYGROUND INSTALLATION SERVICES | ADDENDUM #1- MCKINLEY PLAYGROUND INSTALLATION | 01/22/2020 @ 1:00 PM |
P20-555 | FABRICATED STEEL PARTS | FABRICATED STEEL PARTS | 01/22/2020 @ 1:00 PM |
P20-556 | MUFFIN MONSTER GRINDER REPAIR PARTS | MUFFIN MONSTER GRINDER REPAIR PARTS | 01/22/2020 @ 1:00 PM |
P20-554 | PUBLIC SAETY RADIO & MOBILE COMPUTER REPAIR SERVICES | PUBLIC SAFETY RADIO & MOBILE COMPUTER REPAIR SERVICES | 01/15/2020 @ 1:00 PM |
P20-548 – ADDENDUM ##1 BID DUE DATE CHANGE |
OAK BUSINESS CENTER – FIRE SUPPRESSION SYSTEM UPGRADES TO MEET NFPA 13 | ADDENDUM #1 BID DUE DATE CHANGED TO DECEMBER 18, 2019 @ 1:00 PM |
BID DUE DATE: CHANGED TO DECEMBER 18, 2019 @ 1:00 PM |
P20-548 – ADDENDUM ##1 BID DUE DATE CHANGE |
OAK BUSINESS CENTER – FIRE SUPPRESSION SYSTEM UPGRADES TO MEET NFPA 13 | ADDENDUM #1 BID DUE DATE CHANGED TO DECEMBER 18, 2019 @ 1:00 PM |
BID DUE DATE: CHANGED TO DECEMBER 18, 2019 @ 1:00 PM |